our process
Let us walk you through the steps
-
Concrete Prep
First and foremost we must ensure the concrete is ready to take the coating. A diamond grinding tool will be used to rough up the concrete so that the coating will have a rigid surface to adhere to. Any cracks or holes in the concrete will be filled.
-
Base Coating
Once the surface is cleaned and ready to go, we will apply the base coating. This will be a solid color that is brushed and rolled evenly along the entire surface area.
-
Flakes
Quickly after the base coat is applied, we will start to broadcast the flakes along the edges and center of the surface area. The flakes will consist of up to four different colors that will be mixed and applied evenly
-
Clear Coat
After the base coat and flakes have had a full day to dry, a clear coat of polyurethane will be applied to harden the coating and give it a beautiful shine.
-
drying time
Now that the coating has been fully installed it will need a full 24 hours to dry before any foot traffic is allowed, and 48 hours before any items or furniture can be placed back on top